Request for Amendment to the TSOs proposal of Load Frequency Control (LFC) Structure Methodology

In accordance with Article 141(2) of Commission Regulation (EU) 2017/1485, establishing a guideline on electricity transmission system operation (SOGL), the Utility Regulator (UR) received a proposal for the Load Frequency Control Structure methodology for Northern Ireland. The UR has reviewed the LFC Block Proposal in line with the requirements of the SOGL, its statutory duties and obligations and has decided to request an amendment to the LFC Block Proposal pursuant to Article 6(7) of Regulation 2017/1485.

UR_Decision to request LFC amendment.pdf Pdf (93 KB)

The attached letter sets out the UR’s decision.

Help viewing documents